/
/
/
/
/
Project management and consulting
Location: Grunwaldzka 413, Gdańsk
Building : NEON, Alchemia Business Center
Concept design: Workplace
Executive project: Torus
Year: 2022
Learn more about the project CASE STUDY
We started with on-site inspections and verification of the building's standard in terms of meeting the tenant's needs. We provided opinions on the contract between the tenant - GetResponse - and the General Contractor, Torus, the owner of the building. We has also taken on ourselves the main burden of project organization. We have prepared a material specification, which allowed us to precisely define the technical and material solutions that should appear in the project to meet the highest standard. We analyzed the architectural concept in technical and functional terms. Thanks to this already at the earliest design stage, the Investor could take actions that resulted in a reduction of project costs. After the General Contractor presented the cost estimate we verified it and proposed a multi-discipline value engineering. After being introduced value engineering allowed us to stay within the adopted budget while maintaining the architectural vision prepared by the Designers. During the implementation, we have carried out ongoing technical supervision and continued to support the client in scheduling, cost and project organization issues. We have participated in the final acceptances and have taken part in the procedures for verifying the removal of defects. We completed the project by supporting the client in settling additional works, signing acceptance reports and verifying as-built documentation.